Ground Protection Standard Ground Protection Mat
The everyday 4×8 ft HDPE ground protection mat (12.7 mm, ~37 kg, up to 80 t load) — reversible dual-sided tread, two-person hand lift, reusable for years.
- 4×8 ft
- 1/2 in
- ~37 kg
2026-03-14 · Oil & Gas · China
Heavy-duty and rig mats gave an oilfield services contractor a stable, reusable pad for workover trucks and crane outriggers on saturated wellsite ground.
The customer, an oilfield services contractor working a mature onshore field in northern China, needed reliable ground access around a producing wellhead. The pad soil bakes hard in dry weather but turns to slick, sticky clay within hours of rain, and the pump jacks run continuously, so the crew cannot simply wait for the ground to dry before bringing equipment in.
Workover visits bring in 40-tonne mobile cranes and heavy service trucks several times a season. On wet clay, loaded axles and outrigger points punch straight through the crust, leaving ruts that have to be regraded before the next visit — and a truck bogged at the wellhead stops the whole workover schedule, not just one vehicle.
The team first looked at the standard access mat already used on the lease road, but the wellhead pad regularly takes crane outrigger loads well above what a standard panel is rated for, and a mat that flexes under a loaded outrigger is a safety issue as much as a maintenance one. Stepping up to the heavy-duty range gave the bearing capacity the crane work needed, while the lighter standard mat stayed in service on the lease road where loads are lower.
The contractor laid heavy-duty ground protection mats along the main truck route from the site entrance to the wellhead — roughly 900 m² — and drilling rig mats across the perforated work platform around the wellhead assembly itself. HDPE crane mats went under the outrigger positions to spread point loads from the workover crane's cribbing. The perforated deck lets the platform drain and keeps grip underfoot even in oily mud.
A two-person crew relays the mats ahead of each workover in under a day, moving the stacked panels between pad and truck on a small trailer. The panels have carried at least five workover visits over one season without cracking, no truck has been bogged since they went down, and the site no longer needs the pad regraded between jobs — a real saving against rebuilding a gravel pad each time. The same set of mats has already been picked up and relaid on a second wellhead pad on the same lease, which is the main appeal of matting over gravel: the investment moves with the work instead of staying buried in one spot.
Tell us your equipment load, ground condition, quantity, and destination port — we reply within one business day.
Ground Protection The everyday 4×8 ft HDPE ground protection mat (12.7 mm, ~37 kg, up to 80 t load) — reversible dual-sided tread, two-person hand lift, reusable for years.
Heavy-Duty Heavy-duty 4×8 ft HDPE ground protection mats (16–19 mm, ~50 kg) rated up to 120 t spread load for excavators, dozers, and loaded haul trucks.
Heavy-Duty Heavy-duty virgin HDPE drilling rig mats (4×8 to 7.5×14 ft, up to 828 psi, −50 to +60 °C) — chemical-resistant, anti-static oilfield lease pads.
2026-08-01
A container-scale order of heavy-duty and standard mats moved from press mould to loaded pallet in weeks, ready to stock an overseas rental fleet ahead of its build season.
Read →
2026-07-05
Ground protection mats gave a mid-rise building site a stable haul road from the gate to the pour, keeping concrete mixer trucks moving through a wet spring.
Read →
2026-06-10
Heavy-duty mats carried loaded delivery trucks across a freeze-thaw farm route, protecting topsoil and keeping pipe deliveries on schedule through a winter build window.
Read →